Melton Highway Infill Duplication

Melton Highway Infill Duplication

Duplication delivers safer, better connected road for growing communities

BildGroup partnered with our client to deliver Panel 6 of the Melton Highway Infill Duplication, transforming a single carriageway between The Regency and Crown Drive into a modern dual carriageway. The works included constructing a new two-lane westbound carriageway to the south of the existing road, rehabilitating the original road to serve as the new westbound lane, and tying into the existing roundabout and dual carriageway network.

Beyond the road duplication, our team installed public lighting, a 3.0 metre shared user path and safety barriers along the full alignment. Stormwater drainage made extensive use of recycled plastic pipe and recycled backfill, while water sensitive urban design principles shaped open swales and generous soft landscaping.

Close collaboration with stakeholders, including a nearby day care facility, ensured existing traffic functions on Melton Highway were maintained throughout construction. Strong quality assurance and proactive problem solving kept the project progressing ahead of schedule, delivering improved connectivity for the local community and a durable foundation for the area’s continued growth.

This project was a finalist in the 2026 CCF Earth Awards.