Gateway Estate – Doherty’s Creek, located in Truganina was awarded to BildGroup to be delivered concurrently with the adjoining subdivision works. With a critical program, works were accelerated through winter with multiple crews and extended hours to exceed the expectations of all stakeholders.
As the project is at the downstream end of an in-line channel network, BildGroup arranged multiple handovers in close communication with Melbourne Water to ensure the earliest possible successful delivery to a very high quality.
BildGroup worked closely with Melbourne Water and Connolly Environmental to ensure all works were carried out in a manner that eliminated any impact to the surrounding environment.
February 2019
September 2019
>$5M
Management of wet sloppy material and limited space on site to stockpile was challenging, however with sound planning and organisation, BildGroup was able to successfully control the area.
Continuous management of stormwater and groundwater to allow works to progress throughout an extremely wet winter.
Full GPS machinery (excavators, graders, dozers and compactors) were utilised to ensure earthworks were finished accurately as the design was intricate and very detailed.